How to build a retaining wall that stays put

How to build a retaining wall that stays put is mostly about the work that ends up buried: a leveling pad, a first course set and leveled, and backfill packed in thin layers as the wall rises. The order below follows the concrete masonry trade group's own sequence.

Updated November 15, 2026

Request a quote Call (470) 638-8171

Long trench dug along the foot of a sloped yard beside a house, with loose soil on both sides.
Photo: thebeanblog, CC BY-SA 2.0, cropped

To build a retaining wall that lasts, settle the permit question first and call Georgia 811 to get the utility lines marked. Then the wall goes up in order: dig, build a leveling pad, set and level the base course, and add courses with gravel and compacted backfill behind each one, finishing with caps. The steps below follow CMHA's construction sequence for segmental block walls.

Do you need a permit or an engineer?

For a short wall inside Rome's city limits, often not a building permit. Our retaining wall webpage gives the city's height limit and the loads that rule a wall out. One detail to plan around: Rome measures that height from the bottom of the footing, so the buried course counts toward it.

Engineering is a separate question with its own heights in Georgia's residential code, and the same webpage lists them. Outside the city limits, check the county's rules before building.

CMHA's construction sequence, step by step

Here's the order, with CMHA's numbers where it gives them:

  1. Dig and build the leveling pad. CMHA's pad is crushed stone or unreinforced concrete, at least 6 inches thick, extending about 6 inches past the front and back of the bottom block.
  2. Set and level the base course, then backfill it.
  3. Add gravel. Fill the blocks' open cores with gravel if they have them, and place gravel fill behind the units.
  4. Backfill and compact. Pack the soil behind the gravel in lifts of 8 inches or less, working from the front of the wall back.
  5. Repeat course by course. Place each new course, then backfill and compact behind it.
  6. Add geogrid where the design calls for it. CMHA lays the reinforcement between courses and extends it back into the soil, so the wall and soil work as one mass, and in that reinforced zone it generally limits compaction lifts to 6 to 8 inches.
  7. Cap and finish. Set the caps and finish the grading around the wall.

The drainage pieces, the gravel layer behind the blocks and the pipe at the base, go in as the wall rises, and our retaining wall webpage spells them out.

Why the first course matters most

Everything above rests on it. CMHA says how deep the bottom course is buried depends on the wall's height and the slope at its toe, and that burying it keeps the wall from being undermined by erosion in front.

Clay soil changes the plan. LawnStarter, a cost publisher, says clay soil can be very problematic, and walls built on clay often need extra reinforcements.

Compacting without pushing the wall over

The machine matters near the face. CMHA says that within 3 feet of the wall's face, compaction tools should be limited to hand-operated or walk-behind equipment.

The blocks themselves, and how they lock and stack, are covered in the retaining wall blocks guide.

Geogrid, heavy equipment and other permits

How far apart should geogrid layers be?

CMHA suggests no more than 24 inches of vertical spacing between reinforcement layers. How far each layer runs back into the soil comes from the wall's design, so a reinforced wall gets built to its plan, not to a rule of thumb.

Can heavy equipment work right behind a new wall?

Keep it back. For mortared concrete block gravity walls, CMHA says heavy backfill equipment shouldn't get closer to the top of the wall than a distance equal to the wall's height. A 4-foot wall keeps the machines at least 4 feet back.

Can a short wall still need a permit in Rome?

It can. Rome's building FAQ says that even where no building permit is needed, other permits, such as development, encroachment or special activities permits, may be required depending on the project. Ask the city before digging, especially near a street or a property line.

Built from the base up.